RVSM LOA vs. RVSM OpSpec

Posted on Leave a commentPosted in RVSM

Is RVSM authorization granted through the issuance of OpSpec or an Letter of Authorization (LOA)? Per Advisory Circular (AC) 91-85 if you are a part 91 operator or a part 125 operator holding a letter of deviation authority (LODA), you will simply be issued an RVSM LOA after the RVSM authorization process has been successfully completed.  […]